Skip to product information
1 of 2

CreativeSafetySupply

Project Planning Portrait Whiteboard

Project Planning Portrait Whiteboard

Regular price $740.84 USD
Regular price Sale price $740.84 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

Built for everyday needs from the ground up, the Project Planning Portrait Whiteboard - 60"x 40" combines durable quality with thoughtful design. Built with Aluminum, Metal, Vinyl, available in White, designed for office. Notable features include magnetic dry-erase and dry-erase surface, contributing to its practical character.

Key Features

  • Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
  • Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
  • Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
  • Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
  • Please inspect your whiteboard upon arrival – If you notice any issues, please contact us through Amazon's Buyer-Seller Messaging system

Why Choose the CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40"

The Project Planning Portrait Whiteboard - 60"x 40" combines magnetic dry-erase with versatile build quality, giving users long-term value they can rely on across dry erase boards situations.

Best For

The CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" is best suited for: Office.

Quick Summary

The CreativeSafetySupply Project Planning Portrait Whiteboard - 60"x 40" is a Dry Erase Boards product by CreativeSafetySupply. Brand: Creative Safety Supply. Color: White. Material: Aluminum, Metal, Vinyl. Recommended Uses For Product: Office. Mounting Type: Wall Mount. Price: $493.89.

Product Specifications

Specification Details
Brand Creative Safety Supply
Color White
Material Aluminum, Metal, Vinyl
Recommended Uses For Product Office
Mounting Type Wall Mount
View full details

Image with textDeskLoop Office – Smart, Sleek, and Built for Productivity

Stay organized and work smarter with DeskLoop Office, the ultimate office supply designed to keep your workspace tidy and efficient.

SHOP NOW

Ideal for professionals, students, and home offices

Perfect for home offices, corporate desks, or study spaces, its compact yet versatile design fits seamlessly into any environment.

Frequently Asked Questions

How long does shipping take?

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

How can I get a tracking number for my order?

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

 Is free shipping available?

We do not currently offer free shipping. However, this may be added at some point. We apologize.


How do I process a return or exchange?

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.