Product Overview
For daily routines, the Project Planning Portrait Whiteboard 48" x 36" offers durable performance backed by reliable performance. Crafted from Aluminum, Metal, Vinyl, available in White, designed for office. Notable features include magnetic dry-erase and dry-erase surface, contributing to its reliable character.
Key Features
- Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
- Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
- Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
- Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
Why Choose the CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36"
Among comparable dry erase boards products, the Project Planning Portrait Whiteboard 48" x 36" differentiates through thoughtfully designed build and magnetic dry-erase, both pointing toward thoughtful design.
Best For
The CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" is best suited for: Office.
Quick Summary
The CreativeSafetySupply Project Planning Portrait Whiteboard 48" x 36" is a Dry Erase Boards product by CreativeSafetySupply. Brand: Creative Safety Supply. Color: White. Material: Aluminum, Metal, Vinyl. Recommended Uses For Product: Office. Mounting Type: Wall Mount.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Creative Safety Supply |
| Color | White |
| Material | Aluminum, Metal, Vinyl |
| Recommended Uses For Product | Office |
| Mounting Type | Wall Mount |
