Skip to product information
1 of 6

CreativeSafetySupply

Project Planning Dry-Erase Whiteboard 60" x 40"

Project Planning Dry-Erase Whiteboard 60" x 40"

Regular price $740.85 USD
Regular price Sale price $740.85 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

Focused on everyday convenience, the Project Planning Dry-Erase Whiteboard 60" x 40" uses durable construction to support practical situations. Constructed using Aluminum, Metal, Vinyl, available in White, designed for office, project planning, shift scheduling, task tracking. Notable features include magnetic dry-erase and dry-erase surface, contributing to its thoughtfully designed character.

Key Features

  • Magnetic Dry-Erase Surface – The design is permanently printed onto durable vinyl that won’t smudge, and is resistant to stains and ghosting—ensuring long-lasting visibility and a smooth writing surface
  • Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
  • Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
  • Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
  • Please inspect your whiteboard upon arrival – If you notice any issues, please contact us through Amazon's Buyer-Seller Messaging system

Why Choose the CreativeSafetySupply Project Planning Dry-Erase Whiteboard 60" x 40"

The Project Planning Dry-Erase Whiteboard 60" x 40" reflects deliberate well-made choices, with magnetic dry-erase that supports satisfying experience during regular dry erase boards use.

Best For

The CreativeSafetySupply Project Planning Dry-Erase Whiteboard 60" x 40" is best suited for: Office, Project planning, Shift scheduling, Task tracking.

Quick Summary

The CreativeSafetySupply Project Planning Dry-Erase Whiteboard 60" x 40" is a Dry Erase Boards product by CreativeSafetySupply. Brand: Creative Safety Supply. Color: White. Material: Aluminum, Metal, Vinyl. Recommended Uses For Product: Office, Project planning, Shift scheduling, Task tracking. Mounting Type: Wall Mount.

Product Specifications

Specification Details
Brand Creative Safety Supply
Color White
Material Aluminum, Metal, Vinyl
Recommended Uses For Product Office, Project planning, Shift scheduling, Task tracking
Mounting Type Wall Mount
View full details

Image with textDeskLoop Office – Smart, Sleek, and Built for Productivity

Stay organized and work smarter with DeskLoop Office, the ultimate office supply designed to keep your workspace tidy and efficient.

SHOP NOW

Ideal for professionals, students, and home offices

Perfect for home offices, corporate desks, or study spaces, its compact yet versatile design fits seamlessly into any environment.

Frequently Asked Questions

How long does shipping take?

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

How can I get a tracking number for my order?

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

 Is free shipping available?

We do not currently offer free shipping. However, this may be added at some point. We apologize.


How do I process a return or exchange?

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.