Skip to product information
1 of 6

Lincia

Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board

Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board

Regular price $214.49 USD
Regular price Sale price $214.49 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

Practical durable design meets satisfying experience in the Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board with Lines Sliding Marker Tray Aluminum Frame White Board Planner for Wall Scheduling(36"x24",Project Planning Horizontal), made for common scenarios. Designed with Aluminum, Vinyl, measuring 36"W x 24"H. Notable features include project planning and planning dry, contributing to its reliable character.

Key Features

  • Functional: the project planning dry erase whiteboard with lines is preprinted with common project planning templates, namely project name, due time, on time, assigned to, notes, to help you plan your project clearly and never miss the detail progress, keeping your business in order
  • Easy to Write and Clean: this project planning whiteboard has a smooth and scratch resistant writing surface, allowing you to write smoothly and resist ghosting, it's easy to wipe without leaving stains
  • Detail Specifications: our make ready white board with lines is made of quality materials, with aluminum frame, which is durable and sturdy; And it measures about 36x 24 inches in size, provide ample space to fully display project details
  • Clear and Long Lasting Printing: this ruled dry erase white board adopts erasable design, vinyl printed decals, that is clear printing, not easy to fall off and fade, providing you with a long term application
  • Easy and Convenient to Apply: the project management whiteboard planner is equipped with sliding tray, convenient for you to store marker pens and more writing tools or magnetic accessories, keeping your room tidy; And its magnetic surface supports to apply magnetic pins or strips, making it easier to organize and update information

Why Choose the Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board with Lines Sliding Marker Tray Aluminum Frame White Board Planner for Wall Scheduling(36"x24"

The Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board with Lines Sliding Marker Tray Aluminum Frame White Board Planner for Wall Scheduling(36"x24",Project Planning Horizontal) provides what serious dry erase boards use demands: thoughtfully designed build, project planning, and practical use that lasts.

Best For

When common scenarios is the priority, the Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board with Lines Sliding Marker Tray Aluminum Frame White Board Planner for Wall Scheduling(36"x24",Project Planning Horizontal) stands out for thoughtfully designed engineering and satisfying experience.

Quick Summary

The Lincia Project Planning Dry Erase Whiteboard Magnetic Dry Erase Board with Lines Sliding Marker Tray Aluminum Frame White Board Planner for Wall Scheduling(36"x24" is a Dry Erase Boards product by Lincia. Brand: Lincia. Material: Aluminum, Vinyl. Mounting Type: Wall Mount, Mobile Bracket. Product Dimensions: 36"W x 24"H. Included Components: 1 x Project planning dry erase whiteboard with lines. Price: $142.99.

Product Specifications

Specification Details
Brand Lincia
Material Aluminum, Vinyl
Mounting Type Wall Mount, Mobile Bracket
Product Dimensions 36"W x 24"H
Included Components 1 x Project planning dry erase whiteboard with lines
View full details

Image with textDeskLoop Office – Smart, Sleek, and Built for Productivity

Stay organized and work smarter with DeskLoop Office, the ultimate office supply designed to keep your workspace tidy and efficient.

SHOP NOW

Ideal for professionals, students, and home offices

Perfect for home offices, corporate desks, or study spaces, its compact yet versatile design fits seamlessly into any environment.

Frequently Asked Questions

How long does shipping take?

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

How can I get a tracking number for my order?

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

 Is free shipping available?

We do not currently offer free shipping. However, this may be added at some point. We apologize.


How do I process a return or exchange?

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.