Product Overview
The Eleven Discs Discbound Paper, Junior Size Project Planning Sheets - Premium 120gsm Heavyweight Notebook & Planner Refills - 8 Discs, 5.5 x 8.5 in - Punched for Circa, Arc, TUL (50 Sheets) approaches daily routines from a quality-first angle, with quality build and reliable performance. measuring 5.5 x 8.5 Inches, available in Project Planning. Notable features include project planning and planning get, contributing to its reliable character.
Key Features
- PROJECT PLANNING – Get organized and finish your projects at work, home, or school with our Project Planning Sheets!
- FOCUS ON NEXT ACTIONS – Each Junior Project Planning page contains 4 project description lines, 15 lines for notes, and 10 lines for next actions, each with a completion checkbox.
- HEAVYWEIGHT PAPER – Each pack contains 50 sheets of bright white, super smooth, acid-free, heavyweight 32lb bond (120 gsm) discbound notebook filler paper. Despite being uncoated, due to its thickness our paper is fountain pen friendly and can handle many inks without bleed through, ghosting, or feathering.
- JUNIOR SIZE – 5.5 × 8.5 in. – Compatible with Levenger Circa, Staples Arc, Office Depot TUL, Martha Stewart, Talia, and other 8-disc Junior-sized disc bound notebook systems and planners. Prepunched filler paper, no hole punch required.
- MADE IN USA – Our paper is sourced from mills in the United States. To maintain our standards, our sheets are designed, punched, and packaged in house.
Why Choose the Eleven Discs Discbound Paper
What distinguishes the Eleven Discs Discbound Paper, Junior Size Project Planning Sheets - Premium 120gsm Heavyweight Notebook & Planner Refills - 8 Discs, 5.5 x 8.5 in - Punched for Circa, Arc, TUL (50 Sheets) is the combination of thoughtfully designed design and project planning. Users benefit from thoughtful design, making it a strong pick among planner refills options.
Best For
Geared toward daily routines, the Eleven Discs Discbound Paper, Junior Size Project Planning Sheets - Premium 120gsm Heavyweight Notebook & Planner Refills - 8 Discs, 5.5 x 8.5 in - Punched for Circa, Arc, TUL (50 Sheets) brings thoughtfully designed build quality and consistent reliable performance.
Quick Summary
The Eleven Discs Discbound Paper is a Planner Refills product by ElevenDiscs. Color: Project Planning. Sheet Size: 5.5 x 8.5 Inches. Brand: Eleven Discs. Sheet Count: 50. Product Dimensions: 8.5"L x 5.5"W.
Product Specifications
| Specification | Details |
|---|---|
| Color | Project Planning |
| Sheet Size | 5.5 x 8.5 Inches |
| Brand | Eleven Discs |
| Sheet Count | 50 |
| Product Dimensions | 8.5"L x 5.5"W |
